Skip to main content
Home
Orrcon Steel

Utility Menu

Show — Utility Menu Hide — Utility Menu
  • SHOP
  • CAREERS
  • FAQ

Main navigation

Show — Main navigation Hide — Main navigation
  • Home
  • Products and Services
    • MECSPEC-GAL®
    • TUBE & PIPE
    • Hot Rolled Structural Steel
    • Building Products
    • Roofing Products
    • Fencing Products
    • ORRFIRE® Firepipe
    • Coatings & Finishes Available
  • About Us
    • Why Choose Us?
    • Our Expertise
    • Our Community
    • Meet Our Team
  • News
  • Resources
    • Case Studies
    • Catalogues
    • Product Data Sheets
    • Safety Data Sheets
    • Certificates
    • Technical & Weld Zone Resources
    • 3D House
    • Green Star Rating
    • Glossary
    • Terms & Conditions of Sale
  • BRANCH LOCATOR
  • Contact Us

Utility Menu

Show — Utility Menu Hide — Utility Menu
  • SHOP
  • CAREERS
  • FAQ

Westlink M7 Motorway

Breadcrumb

  1. Home
  2. Resources
  3. Case Studies
  4. Westlink M7 Motorway
SHARE ON:

Related

  • Contributing to Queensland’s Renewable Energy Future
  • Break through building innovation through partnerships
  • MFE CHINCHILLA : ONE MODEL DOESN’T SUIT EVERYONE, BUT A LOCAL FOCUS IS SHINING THROUGH.
  • GM Poles and Orrcon Steel shine bright together
  • Simtrack

LIKE WHAT YOU'RE READING?

We're more than happy to help see it through. Call us or drop us a line.

13000 677 266

info@orrcon.com.au

Enquire Now

The fully electronic Westlink M7 toll road is the result of decades of planning. It connects Sydney’s west and provides an uninterrupted journey between the M2, M4 and M5 motorways. The M7 incorporates intelligent application of more than 150 tonnes of structural steel pipe manufactured by Orrcon Steel. An integral component of the motorway is the construction of a modern and functional cycleway and walking path stretching nearly 40 kilometres. Orrcon Steel Structural Steel Pipe was used in the design, fabrication and construction of the cycleway’s handrail. As part of our commitment to the project, Orrcon Steel arranged for the production of samples of the finished handrail – 76.1mm OD heavy walled pipe – for representatives of the NSW Road Transport Authority to examine prior to installation.

Fabrication subcontractor, Glenn Down of Phoenix Engineering, said “Orrcon Steel had a very positive approach to the project from the beginning, where others said no, Orrcon Steel persevered and provided solutions. Pipe for the handrail – with lengths varying from 2.34 metres to 4.46 metres – were swaged or expanded at one end allowing one section of pipe to fit snugly into the next producing a clean fit then hot-dip galvanised for longevity. The handrail components were cut, swaged, bent, welded and galvanised in Brisbane and delivered to site in Sydney ready for installation."

Orrcon Steel also provided many tonnes of 60.3mm OD and 88.9mm OD steel pipe for use as support posts for the project’s 3,000 glass noise barriers. “The pipe was specified because of its structural strength and aesthetics.”

Project: Westlink M7 Motorway
Customer: Roads and Traffic Authority NSW State Government
Contractor: Abigroup Leighton Joint Venture
Fabricators: Pipe Swaging: Radius Benders Pipe Fabricators: Phoenix Engineering
Orrcon Steel Mill: Brisbane
Orrcon Steel Products: Orrcon Steel Smart Steel Hollow Sections including: CHS 60.3, 76.1, 88.9mm OD

For more information give Orrcon Steel a call on 1300 677 266

Download

Need Help?

WE'LL SEE IT THROUGH

ENQUIRE NOW

Call

1300 677 266

Email us

info@orrcon.com.au

SHARE ON:

Footer Top Menu

Show — Footer Top Menu Hide — Footer Top Menu
  • HOME
  • PRODUCTS AND SERVICES
  • ABOUT US
  • NEWS
  • RESOURCES
  • CONTACT US

Footer Menu

Show — Footer Menu Hide — Footer Menu
  • PRIVACY POLICY
  • TERMS AND CONDITIONS OF SALE
  • Sitemap